Perp DEX Pre-TGE EVM MetaMask

Extended How to Use Extended — From Deposit to Trading

The next Hyperliquid? Earn airdrop points on Extended before TGE

💡 Before you deposit
How to deposit into Extended

Extended accepts USDC on Arbitrum or BNB Chain.
Swap your ETH or BNB to USDC on OKX DEX before depositing.

What is Extended?

Extended has the following features and advantages.

ℹ️
Status as of 2026: Pre-TGE Perp DEX — points campaign is active.
  • 📊 Nearly 100 listed assets — wide range of crypto plus TradFi instruments (US stocks, metals, oil, forex)
  • 🏢 US stocks as perpetual futures — GAFAM, NVIDIA, AMD, Intel, Tesla, MicroStrategy, Coinbase, Robinhood and more as perps
  • 🥇 Commodities & forex — gold, silver, oil, and major currency pairs also available
  • 🪪 No KYC required — use the platform without identity verification
Pre-TGE
Status
USDC
Collateral
Ethereum / Arbitrum One / Base / BNB Chain / Avalanche / Polygon / Arc
Deposit & withdrawal networks

How to Get Started with Extended

1
Install MetaMask wallet
MetaMask is a browser extension wallet for EVM chains.

2
Buy ETH or BNB on a CEX
Buy ETH (for Arbitrum) or BNB (for BNB Chain) on a CEX and withdraw to MetaMask.
3
Swap to USDC on OKX DEX
Swap your ETH or BNB to USDC using OKX DEX.

🔄 Open OKX DEX →
4
Deposit USDC into Extended and start trading
Connect your wallet to Extended and deposit USDC to start trading. Open Extended →
5
Earn points
Points are awarded based on trading volume and other activities.
Keep using the DEX consistently until TGE — that's when tokens are distributed.

Sign up for Extended

Pre-TGE — earn points now before the token launches

✨ Open Extended →

Visual of an EVM multi-asset Perp DEX trading dashboard for Extended

FAQ

Extended is a pre-TGE Perp DEX on EVM chains (BNB Chain, Arbitrum, Base). It offers nearly 100 perpetual futures including crypto, US stocks, precious metals, oil, and forex.

ENA (Ethena) / AVNT (Avante) / BTC / ETH / SOL / BNB / XRP / DOGE / PEPE / SHIB / LINK / UNI / AVAX / SUI / TRUMP / and many more crypto assets — plus S&P500 / AAPL / MSFT / GOOGL / AMZN / META / NVDA / TSLA / MSTR / COIN / AMD / INTC / and other US stocks — plus GOLD / SILVER / OIL / and forex pairs — as perpetual futures (as of the time of writing)

No official date announced. Tokens are expected at TGE based on accumulated points. Follow official announcements for updates.

Extended's trading fees depend on whether your order adds liquidity to the book (maker) or takes it (taker). The base-tier rates are:

· Maker: 0.000%
· Taker: 0.025%

Qualifying makers also earn a rebate based on their share of total maker volume over the past 30 days: 0.002% at ≥0.5% share, 0.004% at ≥1%, 0.008% at ≥2.5% and 0.013% at ≥5%. Rebates accrue automatically at 00:00 UTC daily.

Rates are as documented at the time of writing — check the official site for the current schedule.

Gas fees are very low on both networks — typically just a few cents per transaction. Keep around 0.005 BNB (BNB Chain) or 0.001 ETH (Arbitrum) in your wallet to cover fees.